Terms and Conditions of Supply of Electricity
TERMS AND CONDITIONS OF SUPPLY OF ELECTRICITY CONTENTS |
||
---|---|---|
FORWARD | Forward by Secretary to Government (Power) | |
NOTIFICATION | G.O.Ms.No.28, dated 19th April 1993 | |
CHAPTER-I | PRELIMINARY | |
1 | Short title and commencement | |
2 | Definitions | |
CHAPTER-II | SYSTEM OF SUPPLY AND TARIFF | |
3 | System and classification of supply | |
4 | System of Supply | |
5 | Classification of supply | |
6 | Tariff | |
CHAPTER-III | PROCEDURE FOR ARRANGING PERMANENT POWER SUPPLY | |
7 | Procedure for arranging power supply on Permanent basis. | |
8 | Department's obligation to supply electrical energy | |
9 | Special terms and conditions | |
10 | Service lines | |
11 | Point of supply | |
12 | Procedure applicable to Non-Commercial and Commercial lightning installation | |
13 | Procedure applicable to irrigation pump sets | |
14 | Procedure applicable to Low Tension Industrial installations | |
15 | Procedure applicable to High Tension Industrial installations | |
16 | Procedure applicable to Commercial complexes and Multi-storeyed building installations | |
17 | Procedure applicable to Public lamps | |
CHAPTER-IV | PROCEDURE FOR ARRANGING POWER SUPPLY ON TEMPORARY BASIS | |
18 | Procedure for arranging power supply on Temporary basis. | |
19 | Procedure applicable to the power supply of not more than 2.0 KW without extension of the distributing main | |
20 | Procedure applicable to Low Tension power supply of not more than 10.0 KW and not more than 15 days, without extension of the distributing main | |
21 | Procedure applicable for Low Tension temporary supply in other cases with or without extension of distributing main | |
22 | Procedure applicable for temporary usage in the premises already having permanent supply | |
23 | Procedure applicable for temporary High Tension supply | |
24 | Other conditions applicable for temporary supply | |
CHAPTER-V | WIRING ON CONSUMER'S PREMISES AND MAINTENANCE | |
25 | Wiring on consumer's premises | |
26 | Mains | |
27 | Switches and Fuses | |
28 | Caution Board | |
29 | Overhead mains | |
30 | Earthing | |
31 | Wall plugs | |
32 | Motor Installation | |
33 | Rating of Installation | |
34 | Handling of department's supply mains and equipments in consumer's premises | |
35 | Ownership of the metering equipment | |
36 | Extensions and alterations ( Low Tension installation) | |
37 | Extensions and alternations (High Tension installations) | |
38 | Prohibition of star/star transformers with high tension installations of consumers | |
39 | Balancing of Loads | |
40 | Inspection and Testing | |
40A | Defect in Consumer's Installations | |
41 | Failure of variation in supply | |
42 | Access to consumer's premises and apparatus | |
43 | Notice Before Connection | |
CHAPTER-VI | POWER FACTOR | |
44 | HT Installation | |
45 | LT Installations | |
46 | Tube lights etc., | |
47 | Additional Capacitors | |
47A | Incentive to L.T.Consumers | |
CHAPTER-VII | METERING, POWER SUPPLY CHARGES AND SECURITY DEPOSITS | |
48 | Metering | |
49 | Reading of meters | |
50 | Supply without meter/Defective meter | |
51 | Correctness of meter | |
52 | Power supply charges | |
53 | Electricity Bills | |
54 | Disputes about bills | |
55 | Revision of Bills | |
56 | Payment of Bills | |
57 | Time of Payment | |
57A | Mode of Payment | |
58 | Disconnection of power supply for non-payment of power supply charges | |
59 | Belated Payment surcharge | |
60 | Minimum monthly charges and waver | |
61 | Power to grant permission to pay energy charges in installment | |
62 | Priority for adjustment of payment | |
63 | Security Deposit | |
64 | Meter security deposit (M.S.D) | |
CHAPTER-VIII | AGREEMENTS | |
65 | Agreements and validity of power supply contract | |
66 | Commencement of Agreement | |
67 | Period of agreement for L.T.Supply | |
68 | Period of agreement for H.T Supply | |
69 | Termination of agreement in respect of L.T Supply | |
70 | Termination of agreement in respect of H.T Supply | |
71 | Termination of agreement for L.T consumers where supply of electricity remains disconnected | |
72 | Termination of agreement for H.T consumers where supply of electricity remains disconnected | |
73 | Termination of agreement in case of sale/disposal/lease | |
73A | Resupply after termination | |
74 | Wavier of charges for the causes beyond the control of consumers/ Department | |
75 | Obligation of the Department and the consumer in the absence of power supply agreement | |
CHAPTER-IX | MISCELLANEOUS MATTERS | |
76 | Consumer's increased load requirement | |
77 | Reduction in contract demand/sanctioned load | |
78 | Shifting of service connection | |
79 | Transfer of service connection | |
80 | Conversion from one type of use to another type of use | |
81 | Restrictions on use of electricity | |
82 | Resale of energy | |
83 | Discontinuous due to default of power supply charges | |
84 | Disconnection due to demolition | |
85 | Disconnection due to eviction | |
86 | Disconnection due to non-production of license | |
87 | Discontinuance due to Testing/Maintenance | |
88 | Discontinuance due to violations | |
89 | Discontinuance on consumer request | |
90 | Hiring of equipments | |
90A | Installations of captive generating sets | |
CHAPTER-X | VIOLATIONS AND THEFY OF ENERGY | |
91 | Introduction | |
92 | Violations and compensation charges | |
93 | Additional loads in low tension service | |
94 | Tolerance in connected load | |
95 | Assessment of compensation charges | |
96 | Procedure for collecting compensation charges and for taking other action | |
97 | Multiple violations | |
97A | Second or subsequent violation | |
98 | Theft of energy and extra levy | |
99 | Procedure for collection of the extra levy | |
100 | Second or Subsequent theft /violation | |
101 | Authorised officers | |
102 | Memorandum of appeal | |
103 | Disposal of appeal | |
104 | Powers of Officers to intervene | |
CHAPTER-XI | SERVICES AND CHARGES THEREOF | |
105 | Schedule of services and charges | |
CHAPTER-XII | GENERAL | |
106 | Services of notice | |
107 | Knowledge of acts, rules, orders,etc | |
108 | Interpretation | |
109 | Department's rights to vary Terms and Conditions and to revise the tariff and other charges | |
110 | Recovery of dues as per Acts and Rules framed by the Government of Puducherry | |
APPENDIX | ||
APPENDIX - I | I | Deed of Indemnity (For applicants other than owner of property) |
APPENDIX - II | II | Deed of Indemnity (Services in Government/Porampoke Land) |
APPENDIX - III | III | Undertaking for payment by Installments |
APPENDIX - IV | IV | Show cause notice for Violation (Clause 96(1)) |
APPENDIX - V | V | Assessment Notice for Violation (Clause 96(2)) |
APPENDIX - VI | VI | Show cause notice for Thefy of Energy and Unauthorised Reconnection (Clause 99(1)) |
APPENDIX - VII | VII | Assessment notice for Thefy of Energy and Unauthorised Reconnection (Clause 99(1)) |
Back To Previous Page | Page last updated date: 01-12-2020