Appendix V

Syllabus for operation and maintenance staff who will be engaged in the operation and  maintenance of hydro-electric generating station

Item No Particulars Number of hours
I Concept of modern hydro-station : Type of station, its role in  the power system, base load, peak load operation, plant layout, capacity; underground power station, hydraulic and electrical design features, inter-connection with other stations. 3
II  Hydraulic system; reservoirs-types of reservoirs, storage  capacity, operation of reservoirs, intake tower, surge tank, tunnels, forebays and pen-stocks, protection against water hammer and negative pressure in penstocks, provision for draining penstocks. 3
III  Type of valves: Butterfly valve, spherical valve, needle valve,  their operation and control 3
IV  Water turbines-types of turbines; their characteristics, ratings, specifications, constructional details. 2
V  Governing system; control circuit for governing, types of  governors, pendulum, hydraulic, electronic. 3
V  Governing system; control circuit for governing, types of  governors, pendulum, hydraulic, electronic. 3
VI  Generator: type and rating, cooling and ventilation system,  bearing cooling arrangements, lubrication system, construction and characteristics of generators, split, phase, double layer winding, synchronising, loading, grounding of generator neutral 3
VII  Excitation system, types of excitors, voltage control, automatic  voltage control, amplifying control, magnetic amplifier. 5
VIII  Generator protection: earth fault (rotor and stator), negative  phase sequence, differential protection, backup protection, reverse power protection, under voltage protection, constructional details of the relays used, method of setting and their testing. 10
IX  Hydraulic and electrical protective device, load frequency 3
X  Starting shutting down and operation procedure 3
XI  Power transformer connections, parallel operation, three  single-phase unit versus three-phase unit, regulation, voltage control, tap changing, weights and size grounding. 5
XII  Transformer protection: Buchholz relay, over-current,  differential and earth fault protection, types of relay used, their construction testing and settings. 5
XIII  Transformers-commissioning :Di-electric strength of oil,  insulation, resistance, tap, changer, filtration of oil, pre- commissioning testing. 3
XIV Cooling system for transformers. 2
XV  Circuit breakers, isolator diconnectors bus bar arrangements, charging and synchronising with the grid, disconnecting for repairs, maintenance of switch gear contractors. 4
XVI  Maintenance of equipments in the outdoor switchyard,  current transformers, potential transformers and lighting arrestors, erection, operation and maintenance. 4
XVII  Cables-high voltage, oil filled, cable, types of cables used,  rating of cables, layout testing. 4
XVIII  Principle of electronic controls and transistorised circuits. 3
XIX  Pneumatic and electric transmitters and receivers,  servomotors. 3
XX  Control Board-layout, indicating and recording instruments  for monitoring and supervision, remote control of various equipments, signalling and interlocking, automatic reclosure of breakers on outgoing lines and enunciation system. 3
XXI  Interlocking sequential control circuits, details of components  used. 4
XXII  Calibration and testing of various types of instruments, 4
indicting, recording and analysers..
XXIII  Study of communication system. 1
XXIV  House turbines set-its functions and use. 1
XXV  Station transformers, alternating current, auxiliary supply,  essential auxiliaries, auxiliaries in emergency, study of single line diagrams. Station transformers, alternating current, auxiliary supply, essential auxiliaries, auxiliaries in emergency, study of single line diagrams 3
XXVI  Station direct current system-storage battery, rectifiers motor  generator set, etc., their control and operation, standby source of station power, automatic changeover to standby source of supply. 3
XXVII  Records-(hourly, daily, monthly, annually) of operations. 
 
2
XXVIII  Flow diagram and single line diagram for hydraulic and  electrical systems in the station 5
XXIX  Air conditioning and ventilation plant, compressors. 2
XXX  Operation under emergency conditions. 2
XXXI  General plant maintenance procedures. 3
XXXII  Cranes, hoists-characteristics and controls. 2
XXXIII  Statutory Electricity Acts and Rules, permit procedure. 2
XXXIV  Fire-fighting. 6
XXXV  General safety precautions, first aid. 6
XXXVI  Personnel management, duties and responsibilities, labour  laws and labour welfare. 4
Total Hours   124 